Still a lot to do, but it’s hung in place at the height I will start out at. Now i can start plumbing the 3 closed loops. I’m probably going to change out the t slot portion that attaches the light rack to the unistrut trolleys with wood. It’s plenty sturdy. But, i have 4 ballasts, 8 bricks and two EB832s I need to get up in the air. But this will work for now to get it plumbed. My goal is to be wet testing this weekend.
Contractor should be starting Monday to put the wall, door and build in look starting Monday. I need this in place for these guys too.
Contractor should be starting Monday to put the wall, door and build in look starting Monday. I need this in place for these guys too.