Okay we have put the tank on the stand, Very Heavy, had a buddy help.
Plumbing is dry fit currently. Would like feedback if everything looks good or if I need to change anything (means ordering more parts, so hope not)
It's my first time running a sump so.... My main drain has the gate valve, the middle is the back up, and the other is the emergency. I haven't fitted the pipes inside the overflow box but will.
Follow the full build thread here, https://www.reef2reef.com/threads/72x30x18-diy-build-thread.772638/
Plumbing is dry fit currently. Would like feedback if everything looks good or if I need to change anything (means ordering more parts, so hope not)
It's my first time running a sump so.... My main drain has the gate valve, the middle is the back up, and the other is the emergency. I haven't fitted the pipes inside the overflow box but will.
Follow the full build thread here, https://www.reef2reef.com/threads/72x30x18-diy-build-thread.772638/