Looks awesome!
 
OP
OP
feh

feh

Valuable Member
View Badges
Joined
Feb 26, 2012
Messages
1,526
Reaction score
97
Location
South Carolina
Rating - 0%
0   0   0
Thanks guys. Still plenty of work left to be done, but its taking shape and I couldn't be happier with the way the sump came out.
 
OP
OP
feh

feh

Valuable Member
View Badges
Joined
Feb 26, 2012
Messages
1,526
Reaction score
97
Location
South Carolina
Rating - 0%
0   0   0
Finished sump. I'm excite to see this thing in person. Rick did an awesome job. This thing fills the entire floor of my stand. 22x20.5x15. With such tight space in a cube build I thought the best use of floor space in the stand was to fill the floor with one box I can just shove in, install the equipment, fill it up, and go. By far the sickest sump I have ever owned. This was a belated birthday gift from Sept. and well worth the wait. Many thanks.

1926770_834511399896399_590277422_n.jpg
 

Rob.D

Moderator
View Badges
Joined
Nov 14, 2010
Messages
5,861
Reaction score
1,581
Location
Knoxville, Tn
Rating - 0%
0   0   0
That sump is awesome! Is the left side a built in ATO chamber?
 
OP
OP
feh

feh

Valuable Member
View Badges
Joined
Feb 26, 2012
Messages
1,526
Reaction score
97
Location
South Carolina
Rating - 0%
0   0   0
Got the last bit of the canopy done except the plate for the bottom. I got some cardboard for that I can use to cut a template to measure. Still deciding on whether to go with acrylic or more oak. Based on what I believe is the airflow design for the Radion I don't think I need any vent holes. Maybe a finger hole to slip the USB cable through, but seems the fan draws all the air in and exhausts around the top edges after running thru the heatsink fins. So I think it would be fairly safe. Anyway I think I'm about 85% complete with the stand build and plan to order materials and hardware this Friday and all goes well start working on the equipment slide out cabinet the weekend after. Then I can slide the sump in for a first glimpse of what things are going to look like and get started on installing the hardware to run this thing.

paintedblack.jpg
 
OP
OP
feh

feh

Valuable Member
View Badges
Joined
Feb 26, 2012
Messages
1,526
Reaction score
97
Location
South Carolina
Rating - 0%
0   0   0
Look what I found. :eyebrows:

Top down as it will be oriented in the stand.

topdownsump.jpg


Few details
sideviewoftubing.jpg
 
OP
OP
feh

feh

Valuable Member
View Badges
Joined
Feb 26, 2012
Messages
1,526
Reaction score
97
Location
South Carolina
Rating - 0%
0   0   0
Ordered materials for the last part of the stand build yesterday. All goes well I hope to have it ready for stain after next weekend. Also went ahead and got the hardware to assemble it. I decided to use 2 100lb rated rails and 2 caster wheels under the box to help spread the load.

photo2-1.jpg


While I was at it I went ahead and ordered the float switches, 2nd energy bar for the Apex, heaters, and the RO tubing I plan to use for the ATO and 2 part.

Few more pics of the canopy and the sump inside the stand.

insidecanopy.jpg


canopycloseup.jpg


sumpinstand.jpg
 