150G DD cube build.

OP
OP
E

enemec1

Active Member
View Badges
Joined
Jan 21, 2019
Messages
128
Reaction score
126
Location
outside Philadelphia
Rating - 0%
0   0   0
Waiting on a few hole covers for wires. Electric firs then plumbing.
9e317300041d2a108e1045ae5f84badd.jpg
2c5703c69a49ed8a316d463088f30e9c.jpg
efa8a3b9013ec5b1e37f8f6653895b27.jpg
8afce90be99648a75e3b8e656a8afa42.jpg
 

galantra

Well-Known Member
View Badges
Joined
Jan 16, 2019
Messages
673
Reaction score
161
Location
Greenwich
Rating - 0%
0   0   0
Love the sliding doors great idea; almost getting there. Overall that stand looks amazing can’t wait to see the plumbing.

Have you wired everything yet?
 

galantra

Well-Known Member
View Badges
Joined
Jan 16, 2019
Messages
673
Reaction score
161
Location
Greenwich
Rating - 0%
0   0   0
I am really liking the detail you put into all of this. It looks extremely professional. You actually took this up way more than a couple levels
 
OP
OP
E

enemec1

Active Member
View Badges
Joined
Jan 21, 2019
Messages
128
Reaction score
126
Location
outside Philadelphia
Rating - 0%
0   0   0
I am really liking the detail you put into all of this. It looks extremely professional. You actually took this up way more than a couple levels
Thanks. It's been a long road. I just want to get water in it and move forward, but at same time not rush.
 
OP
OP
E

enemec1

Active Member
View Badges
Joined
Jan 21, 2019
Messages
128
Reaction score
126
Location
outside Philadelphia
Rating - 0%
0   0   0
i have had water in overflow testing the drain lines. some small leaks nothing that a little wrenching down didn't fix. i hope to add test run water this weekend. run return pump and just watch for any leaks.
 

galantra

Well-Known Member
View Badges
Joined
Jan 16, 2019
Messages
673
Reaction score
161
Location
Greenwich
Rating - 0%
0   0   0
Adding more rocks?

It really coming together nicely [emoji1490][emoji1490]
 
Back
Top