Trying to quiet down my overflow. Right now, there is only one Durso standpipe inside of the overflow box. Would it be a better option to convert one of the return lines to a full siphon or drill a hole in the back of the overflow and install a bulkhead for a full siphon drain line (purple box)? Obviously the first option is easier but am open to other ideas.