I thought I would get the plumbing all done this week, but I was wrong. I think the plumbing must be the most difficult part so far. The plumbing itself is not what I had planned out to be because as I dry fitted the pipes, it's not as what I visualized to fit into the stand. I got the overflow plumbing dry fitted. Right now I'm trying to figure out how I am going to plumb the returns with a manifold.