Beginner's 150g CDA Tank

OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
I thought I would get the plumbing all done this week, but I was wrong. I think the plumbing must be the most difficult part so far. The plumbing itself is not what I had planned out to be because as I dry fitted the pipes, it's not as what I visualized to fit into the stand. I got the overflow plumbing dry fitted. Right now I'm trying to figure out how I am going to plumb the returns with a manifold.

20240616_130610.jpg


20240616_130730.jpg
 

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
Take your time on the plumbing and make sure you do it right. Get those measurements as close to perfect as you can. Are you using unions or flexible tubing or all hard pipe?
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
Take your time on the plumbing and make sure you do it right. Get those measurements as close to perfect as you can. Are you using unions or flexible tubing or all hard pipe?

Yea. Using unions and all hard piping for now. I might have to measure some of the pipes again because I didn't realize that when you put the primer/glue on, the pipes will go further into the fittings. At least for the pipes where it has unions. Every other fittings look like it is pretty in.
 

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
The part going into the sump, remember if the pipes are submerged they'll bubble but if they're not submerged they'll make splash noises.
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
The past week, I went got the chance to head down to RAP NY. It was a good first time experience being at an aquarium show. I did not get a lot of time the past week to work on the plumbing, but I got a lot done today. I decided that since I have the overflow dry fitted and thinking of what @tbrown said, I re-measured the pipes and slowly glued them once I was sure of the measurements. I also started dry fitting the returns and figured out how I'll plumb the manifold and the UV (I think). That does it for tonight and hopefully I'll be done by next weekend. Then I get to do some water testing.
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
I continued to work on the plumbing and I'm about 80% completed. Everything is plumbed except for the left return and the UV, which I'm waiting for parts. The right side return and the manifold came out looking better than I thought. I did run into a couple of plumbing mistakes. The first one was gluing the unions and forgetting the nut. The next one was measuring one of the pipes a bit too short. I was going to order more parts and just re-do that section, but decided maybe I can salvage it and if that didn't work, I'll re-do it. I took a hair dryer and heated the PVC pipe on the fittings until it was soft enough to rip it out. That worked out well.
 
Last edited:

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
Cutting short is the worst. You can always cut more off if it's long, but if it's short... Well I haven't been able to find a PVC stretcher at Home Depot lately.
 

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
I wo k for the water department, copper is even worse!
 

JoJosReef

10kW Club member
View Badges
Joined
Sep 27, 2021
Messages
11,693
Reaction score
40,105
Location
Orange County, CA
Rating - 0%
0   0   0
Worst part is gluing it and then realizing it's a couple of fractions short.
Uff, this is why I was sure I'd stay with AIOs, but then got a tank with sump and had the plumbing pre-cut and pre-fit. Hats off to you!
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
Uff, this is why I was sure I'd stay with AIOs, but then got a tank with sump and had the plumbing pre-cut and pre-fit. Hats off to you!
I didn't think plumbing was going to be this difficult. Even my hands are sore from all the twisting and pulling.
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
I'm finally done with the main plumbing. I also plumbed the media reactor to the manifold. The UV plumbing is missing an elbow and will get that installed later this week along with with algae scrubber. With any luck, there won't be any leaks!

20240707_192658.jpg

20240707_192730.jpg

20240707_192951.jpg

20240707_195850.jpg

20240707_195906.jpg

20240707_200002.jpg

20240707_193026.jpg
 
OP
OP
Brisk

Brisk

2500 Club Member
View Badges
Joined
Oct 12, 2023
Messages
4,933
Reaction score
16,399
Location
New York
Rating - 0%
0   0   0
Plumbing is all done and started my leak testing today. From what I've read here, I should let it run for 48 hours? So far no leaks *knock on wood*. Next is to figure out if the pipes inside the overflow is done right. I put a small pipe on the main drain. Then the secondary drain, I'm not too sure if I have it at the right height. I'll play around with it.

20240712_074005.jpg
 

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
Plumbing is all done and started my leak testing today. From what I've read here, I should let it run for 48 hours? So far no leaks *knock on wood*. Next is to figure out if the pipes inside the overflow is done right. I put a small pipe on the main drain. Then the secondary drain, I'm not too sure if I have it at the right height. I'll play around with it.

20240712_074005.jpg
I forget, does your overflow have to sets of weirs or just one? (Top only or top and middle?
 

Gumbies R Us

Certified Noob
View Badges
Joined
Nov 10, 2022
Messages
14,188
Reaction score
24,058
Location
North Georgia
Rating - 0%
0   0   0
Plumbing is all done and started my leak testing today. From what I've read here, I should let it run for 48 hours? So far no leaks *knock on wood*. Next is to figure out if the pipes inside the overflow is done right. I put a small pipe on the main drain. Then the secondary drain, I'm not too sure if I have it at the right height. I'll play around with it.

20240712_074005.jpg
Glad the plumbing went smoothly!
 

tbrown

Nominated Cronie Intern - Might be failing?
View Badges
Joined
Nov 22, 2019
Messages
58,985
Reaction score
144,770
Location
Peoria, AZ
Rating - 100%
2   0   0
I'd say the emergency drain right to the base of the weirs, primary can potentially be no pipe.
 

HAVE YOU EVER KEPT A RARE/UNCOMMON FISH, CORAL, OR INVERT? SHOW IT OFF IN THE THREAD!

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top