- Joined
- Jan 6, 2019
- Messages
- 55
- Reaction score
- 9
GHL's programming terms and logic are somewhat confusing to me as a new user. They often refer to terms without defining them or their function. Control Circuit is mentioned 6 times in the GHL Doser Resource Guide, but its meaning is simply not clear to me. There are 3 Control Circuits available when programming a dosing pump. What are they used for? I'm trying to setup a simple ATO using a single sensor in stand alone mode. I'm using a splitter so I can connect two sensors, for two tanks. Should these be on the same control circuit (1,2 or 3)? Can someone enlighten me.