I’m in the process of mapping out the plumbing for a Pentair 25W UV. I believe the best approach here is to install a ball valve (Cepex) both before AND after the UV, both to control the flow as well as to be able to fully isolate the UV from water for maintenance purposes. Is this correct?
I also have a flow meter I want to install. Does it matter at all whether I install this on the inlet or outlet side?
thank you in advance
I also have a flow meter I want to install. Does it matter at all whether I install this on the inlet or outlet side?
thank you in advance