I just finished mine. Not to bad. Mine is exposed and wanted ir to look alittle nice. If it was hidden would have been schedule 40 pvc and not nearly as neat.First time plumbing a tank, it's all dry fitted finally. I ran out of 3/4 pvc so going to finish tomorrow, just the pipe to the pump. But overflow/ emergency drain and return is done. I placed unions where I thought was needed, are they in the right spots?
I'm connecting vinyl hose from the pump to the pvc with that fitting its threaded , is it the right fitting I need? Couldn't find plastic hose clamps locally cant I just use zip ties ? Thanks for the help, p,s blue is return to pump in pics, do I add union after pump hose to pvc connection?