After weeks of delay, I finally built the mixing station. We have a friend crashing with us and so our garage has been a mess with rearranged stuff vacated from the guest bedroom. We’ve slowly been cleaning and consolidating.
Water test completed. So now I just need to finish a few bulkhead installations for the 1/4” WC and ATO lines and decide how to drill into the floor under the tank into the garage immediately below (which is where station will sit).