My biggest concern would be flow and maintenance. Could probably get a couple tunze 6105 and aim them down to take away dead spots. Would probably do bare bottom on the drop off and sand on the top main section.No experience but I do love the look, hopefully someone with one will chime in.
Edit
Or i could get some of those tunze stream rocks to hide in the scape at the bottom.