Did some maintenance today on my lights. Decided it was a good time to clean the fans on my hydra 26 lights as I am preparing to add another to the setup when the frag system is plumbed into it. So off came the lights and the paint brush.
Here is the setup being disassembled
And the fan and fan cover before cleaning
Here is the light after cleaning
And all assembled and then put back over the tank
Tomorrow I will hopefully receive my frame back from powder coating and then I can begin plumbing.
Hopefully I have all the plumbing pieces necessary to finish the job.
Will be dry fitting everything and then painting all piping purple. Once painted and dried I will glue everything into place. Hopefully this frag setup will be up and running by this coming Saturday.
Here is the setup being disassembled
And the fan and fan cover before cleaning
Here is the light after cleaning
And all assembled and then put back over the tank
Tomorrow I will hopefully receive my frame back from powder coating and then I can begin plumbing.
Hopefully I have all the plumbing pieces necessary to finish the job.
Will be dry fitting everything and then painting all piping purple. Once painted and dried I will glue everything into place. Hopefully this frag setup will be up and running by this coming Saturday.