Hi All - I just recieved a brand new Nyos 120 for the build i'm putting together.
I've been trying to assemble this and have run into a number of issues. I'll be calling EcoTech support tomorrow but figured i'd post to see if anyone had similar issues:
Like I said, I can really muscle it and get it to align but it's definitly putting strain on the base plate
I've been trying to assemble this and have run into a number of issues. I'll be calling EcoTech support tomorrow but figured i'd post to see if anyone had similar issues:
- Issue #1
- The pad / screw holes where you mount the pump do not seem to line up...it's an incredibly tight fit, and it feels like i'm really straining the base in order to get the pump to seat properly. I've watched the assembly videos on Youtube, and the tech was able to screw the pump down by hand with no issues...I'm attaching two photos below (1 head on with the left set of screws aligned and then 1 of the right side which shows how far off the other holes are if the first set are lined up properly.
Like I said, I can really muscle it and get it to align but it's definitly putting strain on the base plate
- Issue #2
- Because of where the pump is when screwed down, I can't get the skimmer body back over the top and into the channel around the base. The cord is in the way and is simply too tight for me pull through the cutout. Again, I believe the pad for the pump and the screw pilot holes are in the wrong place to begin with.