Been working on it a little every evening. This is where I’m at now. Side panels are done they’re held in place by magnets, both are removable and will make access to the sump and roller a breeze, and also to the back side of the electronics, I’ll also use that bottom area to hold the dosing container, reagent for the Kh director, and probably a reactor for carbon should I feel it necessary to run. Now I’ll take it outside this weekend for a sanding and then paint. Getting close!