I've been scratching my head and just can't figure out how to implement the following logic on my Profilux 4
I have 2 maintenance routines:
1) Water change: I turn most of the switches off, including skimmer and ATO pump
2) Filter floss change: Turn skimmer and ATO pump off only
When maintenance one is done, I want to wait 15 mins before the skimmer switch is turned on, and 20 minutes before the ATO pump is switched on.
When maintenance two is done, I want to wait 30 minutes before the skimmer switch is turned on, and 35 minutes before the ATO pump is switched on.
I know that the "Delayed off" function can be used for this purpose, but I just can't figure out how to properly use it.
I was thinking on doing something like this
Programable logic 1
Maintenance 1 DELAYED OFF 900s
Programable Logic 2
Maintenance 1 DELAYED OFF 1200s
Programable Logic 3
Maintenance 2 DELAYED OFF 1800s
Programable Logic 4
Maintenance 2 DELAYED OFF 2100s
Programable Logic 5
Programable Logic 1 NOR Programable Logic 3
Programable Logic 6
Programable Logic 2 NOR Programable Logic 4
This is not working. I don't think I can apply the DELAYED OFF function to the same maintenance with different delays, can I? How can I program this?
Thank you in advance for the help!
I have 2 maintenance routines:
1) Water change: I turn most of the switches off, including skimmer and ATO pump
2) Filter floss change: Turn skimmer and ATO pump off only
When maintenance one is done, I want to wait 15 mins before the skimmer switch is turned on, and 20 minutes before the ATO pump is switched on.
When maintenance two is done, I want to wait 30 minutes before the skimmer switch is turned on, and 35 minutes before the ATO pump is switched on.
I know that the "Delayed off" function can be used for this purpose, but I just can't figure out how to properly use it.
I was thinking on doing something like this
Programable logic 1
Maintenance 1 DELAYED OFF 900s
Programable Logic 2
Maintenance 1 DELAYED OFF 1200s
Programable Logic 3
Maintenance 2 DELAYED OFF 1800s
Programable Logic 4
Maintenance 2 DELAYED OFF 2100s
Programable Logic 5
Programable Logic 1 NOR Programable Logic 3
Programable Logic 6
Programable Logic 2 NOR Programable Logic 4
This is not working. I don't think I can apply the DELAYED OFF function to the same maintenance with different delays, can I? How can I program this?
Thank you in advance for the help!
Last edited: