Hello. I am moving my tank to a new house and the only feasible spot for it runs parallel to joists:
92 gallon rimless (Reefer 450)
55 gallon sump underneath
Stand weighs close to 200 lbs
The joists are I-Beam (see picture)
There is one single joist directly underneath the tank. The rear of the tank sits at a concrete foundation support, and on one side there is concrete support where the single joist starts.
There is about 8 ft between the two supports of the joist, and I added 2 floor jacks about 2.75 ft apart from eachother in between the ends of the joist.
Any opinions on this? Preferably people with real knowledge / experience / related job skills
92 gallon rimless (Reefer 450)
55 gallon sump underneath
Stand weighs close to 200 lbs
The joists are I-Beam (see picture)
There is one single joist directly underneath the tank. The rear of the tank sits at a concrete foundation support, and on one side there is concrete support where the single joist starts.
There is about 8 ft between the two supports of the joist, and I added 2 floor jacks about 2.75 ft apart from eachother in between the ends of the joist.
Any opinions on this? Preferably people with real knowledge / experience / related job skills