Cycling new tank

OP
OP
chorizo619

chorizo619

Community Member
Review score
+0 /0 /-0
View Badges
Joined
Mar 29, 2021
Messages
34
Reaction score
69
Review score
+0 /0 /-0
Location
san diego
Rating - 0%
0   0   0
np, just check to make sure u can get the tubing on and off the pump and not mess up the other plumbing (this was my whole issue), its hard to tell the head room under the sump to tell how much room you are working with. Dont want a flood happening or anything, when you are settled on the position of everything, see if the check valve is pvc and pvc cement the fittings just in case
Pvc, cementing after I dry the pipes off
 
BRS
Avast

Polyp polynomial: How many heads do you start with when buying zoas?

  • One head is enough to get started.

    Votes: 27 10.6%
  • 2 to 4 heads.

    Votes: 145 57.1%
  • 5 heads or more.

    Votes: 65 25.6%
  • Full colony.

    Votes: 10 3.9%
  • Other.

    Votes: 7 2.8%
BSA
Back
Top