Bottom drilling vs back drilling

DirtDiggler2823

If I can't break it, it doesn't exist
View Badges
Joined
Jul 31, 2018
Messages
1,667
Reaction score
2,077
Location
Gambrills
Rating - 0%
0   0   0
My tank is a strange AIO setup that poses some interesting situations as far as how to drill and plumb it. I was going to go with an overflow box, and drill the back glass, but then i got to thinking that i could use the existing weir and filter space built into the tank, and drill into that, which would shorten the amount of piping required by quite a bit. I'm fairly certain that the entire tank is not tempered glass, although i will verify that. Please take a look and let me know what ya'll think. The bio-balls are coming out, and I'm aware that I would probably have to make the weir bigger.

20180721_130106.jpg


20180721_130112.jpg


20180721_130120.jpg


20180721_130125.jpg
 
OP
OP
DirtDiggler2823

DirtDiggler2823

If I can't break it, it doesn't exist
View Badges
Joined
Jul 31, 2018
Messages
1,667
Reaction score
2,077
Location
Gambrills
Rating - 0%
0   0   0
First deciding factor would be if the glass is tempered. Bottom panes typically are, so that would make the decision for you. :)

This is a strange custom build, and I know I will have to verify whether it is tempered or not, but in the case that it isn't, I'm looking for suggestions.
 

WVNed

The fish are staring at me with hungry eyes.
View Badges
Joined
Apr 11, 2018
Messages
10,206
Reaction score
43,634
Location
Hurricane, WV
Rating - 0%
0   0   0
I would drill the back using a template for the overflow box of your choice in the center section. That way if you have the option to remove the guts and add the overflow box later.
 
OP
OP
DirtDiggler2823

DirtDiggler2823

If I can't break it, it doesn't exist
View Badges
Joined
Jul 31, 2018
Messages
1,667
Reaction score
2,077
Location
Gambrills
Rating - 0%
0   0   0
I would drill the back using a template for the overflow box of your choice in the center section. That way if you have the option to remove the guts and add the overflow box later.

So, same concept as drilling from the bottom and using the existing stuff as the weir, but drilling the back instead?
 
OP
OP
DirtDiggler2823

DirtDiggler2823

If I can't break it, it doesn't exist
View Badges
Joined
Jul 31, 2018
Messages
1,667
Reaction score
2,077
Location
Gambrills
Rating - 0%
0   0   0
Done drilling. The cheap bit i used died somewhere between the 2nd and 3rd holes, which made drilling the 4th hole extra fun. Either way, the most terrifying task I've had to undertake thus far is now done.

20180916_222930.jpg


20180916_192846.jpg
 

Dom

Full Time Reef Keeper
View Badges
Joined
Apr 29, 2016
Messages
6,449
Reaction score
6,945
Location
NY
Rating - 0%
0   0   0
I prefer to drill the bottom. I don't like all of that plumbing outside the footprint of the tank when drilling in the back.
 
OP
OP
DirtDiggler2823

DirtDiggler2823

If I can't break it, it doesn't exist
View Badges
Joined
Jul 31, 2018
Messages
1,667
Reaction score
2,077
Location
Gambrills
Rating - 0%
0   0   0
I prefer to drill the bottom. I don't like all of that plumbing outside the footprint of the tank when drilling in the back.
The bottom had been drilled, and patched by whoever made the tank. I didn't feel like dealing with all of that. I did get a lot more options with drilling the back as well as far as what i could plumb.
 
Back
Top