I thought I would share my small mixing station.
Parts:
Hygger 1060 External (budget pump) :
Bulkheads (4):
Float Valve:
Ball Valves (6):
PVC Schedule 40: ~10 feet (3/4") , 2 feet (1")
T-Connectors : 3/4" (10, bought in bulk), only used 3. 3/4", 3/4", 1" (1)
Elbow Connetors: 3/4" (10, bought in bulk), used 6
Slip to Female connector (2): 3/4"
Male to Barb connector (2): 3/4"
Flex Tubing: 3/4"
Universal Pipe Adhesive
Rubbermade Brute 20G garbages
Total build was ~$200
I made one small mistake at the end of the build. I inadvertently connected a slip to male connection instead of female. I ordered a Female to Barbed connector to fix.
![PXL_20221210_185827569.jpg PXL_20221210_185827569.jpg](https://test.reef2reef.com/data/attachments/2857/2857481-b4ab57a2a92a39c2135bc13f5ac4fe7d.jpg)
Parts:
Hygger 1060 External (budget pump) :
Bulkheads (4):
Float Valve:
Ball Valves (6):
PVC Schedule 40: ~10 feet (3/4") , 2 feet (1")
T-Connectors : 3/4" (10, bought in bulk), only used 3. 3/4", 3/4", 1" (1)
Elbow Connetors: 3/4" (10, bought in bulk), used 6
Slip to Female connector (2): 3/4"
Male to Barb connector (2): 3/4"
Flex Tubing: 3/4"
Universal Pipe Adhesive
Rubbermade Brute 20G garbages
Total build was ~$200
I made one small mistake at the end of the build. I inadvertently connected a slip to male connection instead of female. I ordered a Female to Barbed connector to fix.
![PXL_20221210_185757045.jpg PXL_20221210_185757045.jpg](https://test.reef2reef.com/data/attachments/2857/2857480-0df99081af9857a4c725af4060e7a7bc.jpg)
![PXL_20221210_185827569.jpg PXL_20221210_185827569.jpg](https://test.reef2reef.com/data/attachments/2857/2857481-b4ab57a2a92a39c2135bc13f5ac4fe7d.jpg)