Second Nero 5 failure this year, both just out of warranty.
First was the dreaded flashing red light, this one more serious.
At $500 a pop these are just poor value for money and really badly designed.
I can get 5 Jaebos for the price of one Nero5 and replace every year on schedule and be well ahead.
Grrr.
First was the dreaded flashing red light, this one more serious.
At $500 a pop these are just poor value for money and really badly designed.
I can get 5 Jaebos for the price of one Nero5 and replace every year on schedule and be well ahead.
Grrr.