I was piecing together a system, but decided to go another route for automation. I've tested these as far as powering on the devices, and connecting to the apex via fusion, but that's it as far as testing goes. I never acquired the full system to set it up. You'll need a powerbar and a set of probes. Includes everything in the pictures. 1link cable is new in packaging, everything else is used, as-is.
$500 shipped
$500 shipped