I am not sure how to do this, so throwing it out to the community. This one hurts my head. Thanks in advance.
So I am currently adding kalk via auto top off. I am using an Avast kalk stirrer. It works well. However, I'd like to make the PH as stable as possible.
The idea I had was to split the incoming RO water line. Then each branch of that would have a solenoid switches. One line would go to the kalk stirrer, the other would go straight to the sump. Then with a bit of apex programming I'll have the switches open/close depending on the PH probe reading. In theory that works.
I just opened up the two SV-1 packets and was going to plug them into the Apex 832 which has two ports. Which I should have checked first. Because one of the ports is currently being used by the avast ato.
So now I am trying to work out how to do this using only one SV-1 solenoid.
Any ideas?
So I am currently adding kalk via auto top off. I am using an Avast kalk stirrer. It works well. However, I'd like to make the PH as stable as possible.
The idea I had was to split the incoming RO water line. Then each branch of that would have a solenoid switches. One line would go to the kalk stirrer, the other would go straight to the sump. Then with a bit of apex programming I'll have the switches open/close depending on the PH probe reading. In theory that works.
I just opened up the two SV-1 packets and was going to plug them into the Apex 832 which has two ports. Which I should have checked first. Because one of the ports is currently being used by the avast ato.
So now I am trying to work out how to do this using only one SV-1 solenoid.
Any ideas?