I am getting ready to hang everything on my control board. I have all Neptune and from L/R, top: COR controller, Apex, EB832; bottom DOS (for the future), 1Link (for WAV). Any issues that you all might see that I am not considering?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature currently requires accessing the site using the built-in Safari browser.
Thanks for the comments, but the picture may not have had enough context, so another is below. I am am planning to throw most of my cables in back, which would be closed to the EB832. Maybe i could create space by putting the EB on the "outside?"Myself, I would place the EB832 in the bottom left corner - as this will reduce the length of your wiring runs (and the cabling can be bundled at the bottom).
DOS I would earmark for the right side so you have room for 2 DOS units and/or supplements that you can place in a basket in the lower right corner.
Option: Get a polymer or MDF panel and mount that to the back instead - then the equipment to that. If you ever change your mind you can just replace the panel as opposed to having to drill all new holes.
No. The stand was designed for that side to be the "Control Wall" and the back is open with no place to mount a board.Is this a peninsula tank?